This website uses cookies

This website uses cookies to ensure the functionality of the website. In addition, with your consent, we can use cookies to collect information on the use of the website in order to constantly improve the website. By clicking on the “Only allow essential cookies” button, you reject the use of cookies other than essential cookies. By ticking the “Statistics” and “Marketing” boxes and clicking the “Allow selection” button, you consent to the use of other cookies. All essential, marketing and statistics cookies are accepted via the “Accept all cookies” button. You can obtain differentiated information on the individual cookies in the data protection information. You can revoke your consent at any time by clicking on the “Cookie settings” button at the bottom left.




Essential cookies enable basic functions and are necessary for the website to function properly.
Statistics cookies collect information anonymously. This information helps us to understand how our visitors use our website.
Marketing cookies are used by third parties or publishers to display personalized advertisements. They do this by tracking visitors across websites.



Results

45 results:
21.Railway Line Concept  Basically there are two communication interfaces available: DISPO serial data bus for: disposition diagnosis/service STRENET serial data bus for: block track 
22.Service Concept  At station computer there is a diagnosis- and service program installed, which is responsible for data registration, data storage, data displaying, analysis, automatically alerting and data transfer 
23.Road Signals  Due to the transferring of control tasks direct to the field element, the BUES 2000 permits the use of processor-controlled LED signalling devices which function with their own intelligence and 
24.Level Crossing Control System  The structure of the electronical level crossing system BUES 2000 is classified into three levels. The main level of the BUES 2000 electronic level crossing system represents the 
25.Barrier Drive Electronic Level Crossing System BUES 2000 – useful securing with HSM 10E Hardware of HSM 10E Modular structure with system parts that can be replaced on site: housing, barrier shaft, drive unit 
26.Train Detection Technology  induction loops in the form of an "8" (2 x 5 railway sleeper compartments) double-oscillator subassembly (DOZBG) for activation and preparation of the signals from 2 induction loops  
27.Axle Sensor  The axle sensor consists of 2 small inductive loops which are integrated in a compact housing which can be fastened to the rail and which by reason of their longitudinal extension is evaluated in an 
28.Sound Signal AWD 2000 - acoustically warning devices - audible safeguarding For alerting of approaching trains to traffic participants at level crossings there will be used according to validity regulation 
29.Battery Charger  1000 to 1400 Watt, battery charger power at secondary side Voltage of 18V, 24V, 30V, 36V or 60V. functioning according to primary cycled switch-mode power supply principle with power correction 
30.Service Concept  At station computer there is a diagnosis- and service program installed, which is responsible for data registration, data storage, data displaying, analysis, automatically alerting and data transfer 
Search results 21 until 30 of 45

Frank Dohmen

Human Resources

 

Yvonne Kuzmanovic

Human Resources
 

jobs@scheidt-bachmann.de

Scheidt & Bachmann GmbH
Breite Str. 132
41238 Mönchengladbach

Find a Career

Contact us

Fields marked with * are required