This website uses cookies

This website uses cookies to ensure the functionality of the website. In addition, with your consent, we can use cookies to collect information on the use of the website in order to constantly improve the website. By clicking on the “Only allow essential cookies” button, you reject the use of cookies other than essential cookies. By ticking the “Statistics” and “Marketing” boxes and clicking the “Allow selection” button, you consent to the use of other cookies. All essential, marketing and statistics cookies are accepted via the “Accept all cookies” button. You can obtain differentiated information on the individual cookies in the data protection information. You can revoke your consent at any time by clicking on the “Cookie settings” button at the bottom left.




Essential cookies enable basic functions and are necessary for the website to function properly.
Statistics cookies collect information anonymously. This information helps us to understand how our visitors use our website.
Marketing cookies are used by third parties or publishers to display personalized advertisements. They do this by tracking visitors across websites.



Results

6 results:
1.Operations Control System … ZNP 801 for decentralized train tracking in older interlocking types (not CBI). It eliminates the manual activity of train announcing as well as information collection, disclosure and archiving. Additional… 
2.Apprenticeship & Dual degree programme … mechanic (m/f/d) specialising in fine equipment construction is the right thing for you if you have manual skills, are fit in maths, physics and English and are interested in technical and physical… 
3.Operation Management Concept … failures between interlocking and dispatcher desk are always possible. Here a HST subassembly (Man Manual User Interface Subassembly) is used, this is also connected to the EBUS (element bus as CAN bus). The… 
4.Level Crossing Control System … 32 barrier drives 8 pedestrian acoustic systems 2 tracks (with track sensors, signalling, manual switching keys) interlocking interface radar scanner (radar sensor system for automatic level… 
5.Help entervo smart pay US … parking ticket.  Before you leave, select scan.  Enter your full license plate number manually. Pay fee conveniently with your mobile device.  Exit the car park.    With… 
6.Interlocking Control System … spring switches (trailable points) electrically locally operated switches and scotch blocks manually operated switches and scotch blocks with key requirements train routes shunting routes … 

Frank Dohmen

Human Resources

 

Yvonne Kuzmanovic

Human Resources
 

jobs@scheidt-bachmann.de

Scheidt & Bachmann GmbH
Breite Str. 132
41238 Mönchengladbach

Find a Career

Contact us

Fields marked with * are required