This website uses cookies

This website uses cookies to ensure the functionality of the website. In addition, with your consent, we can use cookies to collect information on the use of the website in order to constantly improve the website. By clicking on the “Only allow essential cookies” button, you reject the use of cookies other than essential cookies. By ticking the “Statistics” and “Marketing” boxes and clicking the “Allow selection” button, you consent to the use of other cookies. All essential, marketing and statistics cookies are accepted via the “Accept all cookies” button. You can obtain differentiated information on the individual cookies in the data protection information. You can revoke your consent at any time by clicking on the “Cookie settings” button at the bottom left.




Essential cookies enable basic functions and are necessary for the website to function properly.
Statistics cookies collect information anonymously. This information helps us to understand how our visitors use our website.
Marketing cookies are used by third parties or publishers to display personalized advertisements. They do this by tracking visitors across websites.



Results

45 results:
1.Interlocking System  The Electronic Interlocking System ZSB 2000 - Just to make sure Additional Information Teaser Related Files  
2.Level Crossing System  Electronical Level Crossing System BUES 2000 - Just in case Additional Information Related Files  
3.Planning  We are able to realise all necessary planning services. As a manufacturer of Signalling Systems we can pre-plan suitable services and coordinate projects and realisations tasks. Our planning 
4.Train Signals  Actuation of the signals are controlled via a safe electronic subassembly, called LSS-BG (Light-Signal-Control Subassembly), which is installed at each main signal location. This 
5.Switchpoint Control System Electronic Interlocking System ZSB 2000 - Switch Point Control The switch control subassembly (WST-BG) is an electronic subassembly for actuating switch mechanisms whereby the changing and 
6.Train Signals With optical variants: 200 mm light signal diameter, LED panel with 64 LEDs, optical system for uniform surface illumination, UVresistant plastic housing, 200 mm light signal diameter, 
7.Construction & Service  Nowadays, not only the planning, supervision of constructional works and coordination of all crafts, also the handling of all accompanying constructional services (underground engineering, 
8.Parking Solutions Imprint Scheidt & Bachmann Parking Solutions GmbH Breite Straße 132 41238 Mönchengladbach Deutschland +49 2166 266-335 parking-solutions@scheidt-bachmann.de Managing Director: Martin 
9.Data Privacy entervo smart pay Data Privacy Smart Pay App Information according to Art. 13, 14 and 21 of the General Data Protection Regulation (GDPR) This data protection information applies to the collection, processing and 
10.Data Privacy entervo smart pay US Data Privacy Smart Pay App Information according to Art. 13, 14 and 21 of the General Data Protection Regulation (GDPR) This data protection information applies to the collection, processing and 
Search results 1 until 10 of 45

Frank Dohmen

Human Resources

 

Yvonne Kuzmanovic

Human Resources
 

jobs@scheidt-bachmann.de

Scheidt & Bachmann GmbH
Breite Str. 132
41238 Mönchengladbach

Find a Career

Contact us

Fields marked with * are required