Latest news
New generation of level crossing system successfully put into operation at Luleå in Sweden
- Signalling-Systems
Sweden has an extensive infrastructure network, which covers 16,500 kilometres of railway lines. However, the level crossing technologies used in...
New command and control system successfully put into operation at the Regiobahn
- Signalling-Systems
The Regiobahn operates two lines with a total length of 25 km. The west part from Kaarster See to Neuss and the east part from Düsseldorf-Gerresheim...
Nordic Rail 2015; railway signalling exhibition for Scandinavia
- Division
The Nordic Rail trade fair for the Scandinavian rail sector was a rewarding event especially for Scheidt & Bachmann Sverige thanks to the positive...
Upcoming events
No entries available.
back